To check your PM Surya Ghar subsidy status in Bengaluru, log in to pmsuryaghar.gov.in using your registered mobile number and BESCOM consumer number. Go to "Track Application Status" — it shows your current stage: feasibility approved, installation done, net meter commissioned, or subsidy credited. The subsidy of ₹78,000 for 3kW systems is credited directly to your Aadhaar-linked bank account within 4–6 weeks of BESCOM commissioning. If you used Bengaluru Solar for your installation, we track this for you and WhatsApp you the moment it lands.

What each status stage means

Status shownWhat it meansWhat happens next
Application submittedRegistered on portalBESCOM reviews feasibility
Feasibility approvedBESCOM approved your roofSelect vendor and proceed
Installation completedSystem installedBESCOM inspection scheduled
Net meter commissionedBESCOM meter installedSubsidy claim submitted
Subsidy creditedMoney in your account ✓Check your bank account

Why is my subsidy delayed?

The most common reasons for PM Surya Ghar subsidy delays in Bengaluru: bank account not linked to Aadhaar (DBT requirement), net meter not yet commissioned by BESCOM, or commissioning documents not submitted correctly by the vendor. If your status has been stuck for more than 6 weeks after net meter installation, WhatsApp us — we follow up with BESCOM on your behalf even for systems we didn't install.

About HSR Layout — local context

HSR Layout's wide 30×40 and 40×60 plots have excellent RCC flat roofs — ideal for 3–4kW systems. BESCOM bills here average ₹3,500–₹5,000 due to home offices, ACs, and EV chargers. The Koramangala BESCOM subdivision handles HSR Layout net metering efficiently. Landmarks: BDA Complex, Outer Ring Road, HRBR Layout junction, 27th Main Road.

Subsidy Status Check — what we do

  • National portal registration at pmsuryaghar.gov.in using your BESCOM consumer number
  • BESCOM feasibility application — technical assessment of your {location} property
  • Empanelled vendor coordination — we are a registered vendor for BESCOM area
  • Installation and commissioning documentation as required by MNRE
  • Net meter application and BESCOM inspection coordination
  • Subsidy claim filing after BESCOM approves the installation
  • Subsidy tracking — we follow up with BESCOM until ₹78,000 reaches your account
  • WhatsApp updates at every stage — you always know what's happening

Pricing for HSR Layout

SystemCostSubsidyYou payMonthly savingsPayback
Assistance only₹0₹30,000–78,000Free with installationFull subsidy
1 kW system₹65,000₹30,000₹35,000~₹800/mo~5.8 yrs
3 kW system₹1,65,000₹78,000₹87,000~₹2,400/mo~3.6 yrs

Book your free survey in HSR Layout.

We'll visit within 48 hours, assess your requirements, and give you a detailed quote — free, no obligation.

Book free site survey →

Back to PM Surya Ghar Assistance in HSR Layout