About Indiranagar — why solar makes sense here

Indiranagar's independent houses on 1st to 12th Main Road have strong RCC roofs and high bills of ₹5,000–₹9,000/month. Tech professionals working from home, EV chargers, and premium appliances drive consumption. 100 Feet Road, Defence Colony, CMH Road, and Domlur flyover are local landmarks. BESCOM East subdivision covers Indiranagar.

What's included in Indiranagar

  • Free site survey within 48 hours — roof assessment, shading analysis, savings calculation
  • PM Surya Ghar portal registration and documentation — we file on your behalf
  • BESCOM feasibility approval — handled end-to-end, no office visits needed
  • Tier-1 BIS-certified panels with 25-year performance warranty
  • Professional installation in 1–2 days with WhatsApp photo updates
  • Net meter commissioning — your BESCOM bill starts dropping immediately
  • Subsidy tracking until ₹78,000 lands in your Aadhaar-linked bank account
  • Annual maintenance contract (AMC) — included, not upsold

Pricing for Indiranagar

SystemCostSubsidyYou payMonthly savingsPayback
1 kW₹65,000₹30,000₹35,000~₹800/mo~5.8 yrs
2 kW₹1,20,000₹60,000₹60,000~₹1,600/mo~4.4 yrs
3 kW₹1,65,000₹78,000₹87,000~₹2,400/mo~3.6 yrs
4 kW₹2,10,000₹78,000₹1,32,000~₹3,200/mo~4.5 yrs
5 kW₹2,55,000₹78,000₹1,77,000~₹4,000/mo~4.6 yrs

Subsidy is capped at ₹78,000 for systems 3kW and above. Credited directly by Government of India after BESCOM inspection.

Sub-services in Indiranagar

3kW System → 5kW System → PM Surya Ghar → BESCOM Net Metering →

BESCOM process for Indiranagar

Indiranagar falls under BESCOM's East subdivision. All net metering applications and PM Surya Ghar subsidy approvals are processed through this subdivision. We handle all interactions on your behalf — no office visits needed. Typical feasibility approval timeline: 10–18 working days.

Frequently asked questions — Indiranagar

Under PM Surya Ghar, you get ₹78,000 for a 3kW system, ₹60,000 for 2kW, and ₹30,000 for 1kW. The subsidy is credited directly to your Aadhaar-linked bank account after BESCOM inspection.
From your free site survey to a working system, expect 4–8 weeks. BESCOM feasibility approval takes 2–3 weeks. The installation itself is 1–2 days. We send WhatsApp updates at every step.
No. We handle everything online — PM Surya Ghar portal, BESCOM feasibility, and net metering paperwork. You share your BESCOM consumer number and Aadhaar bank details once, we manage the rest.
Most Indiranagar homes with bills of ₹2,000–₹5,000/month need a 3kW system. Our free site survey assesses your roof, shading, and actual consumption to recommend the right size.
Most Bengaluru roofs — RCC flat or tiled — work well for solar. We check structural load, shading from trees or buildings, and orientation in our free survey. If your roof needs work first, we'll tell you upfront.

Book your free survey in Indiranagar.

We visit your home within 48 hours, assess your roof, and give you an exact savings calculation — free, no obligation, in Kannada or English.

Book free site survey →