About Electronic City Phase 2 — why solar makes sense here

Electronic City Phase 2 has established residential areas with tech professionals driving high electricity consumption. Neeladri Road, Hebbagodi, Bommasandra, and Attibele Road are landmarks. Independent houses here have strong RCC construction. BESCOM South-East subdivision handles Phase 2 applications.

What's included in Electronic City Phase 2

  • Panel cleaning — removes dust, bird droppings, and pollution film that reduces output
  • Inverter inspection — check error codes, firmware, DC/AC voltage readings
  • String and wiring safety check — connections, earthing, junction boxes
  • Performance comparison — actual vs expected generation, identify underperformance early
  • WhatsApp report — photos before and after, generation data, findings summary
  • Priority response — AMC customers get same-day response for faults
  • Free between-visit support — WhatsApp us for any concerns at no extra charge

Pricing for Electronic City Phase 2

SystemCostSubsidyYou payMonthly savingsPayback
1–2 kW₹3,000/yr₹3,000/yrMaintain full outputImmediate
3–4 kW₹4,500/yr₹4,500/yrMaintain full outputImmediate
5 kW+₹6,000/yr₹6,000/yrMaintain full outputImmediate

Subsidy is capped at ₹78,000 for systems 3kW and above. Credited directly by Government of India after BESCOM inspection.

Sub-services in Electronic City Phase 2

Panel Cleaning → Inverter Service → Performance Check → Annual Contract →

BESCOM process for Electronic City Phase 2

Electronic City Phase 2 falls under BESCOM's South-East subdivision. All net metering applications and PM Surya Ghar subsidy approvals are processed through this subdivision. We handle all interactions on your behalf — no office visits needed. Typical feasibility approval timeline: 10–18 working days.

Frequently asked questions — Electronic City Phase 2

In Bengaluru's dusty conditions, panels need cleaning every 3–4 months. Our AMC includes 2 visits per year as a minimum — more if your location has heavy dust or bird activity.
Studies show Bengaluru rooftop systems lose 15–25% of output from soiling alone. In monsoon season, algae growth can cause further losses. Regular cleaning recovers this output fully.
Two preventive maintenance visits per year — panel cleaning, electrical safety check, inverter inspection, and a WhatsApp performance report with photos. Plus priority response for any faults between visits.
Yes. We service systems installed by any company in Electronic City Phase 2. We'll assess the system's current condition and propose an appropriate AMC or one-time service package.
Compare your inverter's daily generation reading against expected output (roughly 4 units per kW per day on a sunny day in Bengaluru). If you're consistently 20%+ below this, call us for a check.

Book your free survey in Electronic City Phase 2.

We visit your home within 48 hours, assess your roof, and give you an exact savings calculation — free, no obligation, in Kannada or English.

Book free site survey →